Chat Transcript: Money Talk$: Student Loans (Fredericksburg.Com)
Obama Graces Newsweek Cover as ‘First Gay President’ (CTV News Channel (Canadian CNN) (The Globe and Mail)
Neil Howe Addresses UMW Graduates (Stafford County Sun)
Parking Lot Closure
The following message is from the office of Parking Management:
On Thursday, May 17, GW/Westmoreland parking lot and Double Drive will be reserved all day for the Rappahannock Regional Criminal Justice Academy graduation ceremony. This is an event the University has proudly hosted for a number of years and we look forward to having the graduates and their families on our campus.
Faculty and staff may use all other parking areas including College Ave., University parking deck, Thornton Street and Sunken Street lots, Jefferson Hall and Framar lots and Pizza Hut lot. The Monroe lot will be reserved for a faculty sponsored conference that day.
Thank you for your patience and cooperation.
Questions may be directed to:
Robin L. Jones
UMW Parking Management Supervisor
540-654-1129
UMW Graduation List (The Free Lance-Star)
UMW Graduation Awards for Class of 2012 (Fredericksburg.Patch.Com)
‘Millennial Generation’ Graduates From UMW (Fredericksburg.Patch.Com)
SimVentions Offering College Training Program (Fredericksburg.Com)
ITCC Construction Update
Dear Colleagues:
Beginning Monday, May 14, campus walk on the north side of the Simpson Library will be closed. All pedestrian and handicapped traffic will be detoured to College Avenue. Signs will be provided to remind everyone of the new travel patterns.
Sidewalks and stairways within the construction site and a portion of Campus Walk will be removed to facilitate underground utility work involving water, sewer, electrical, and telecommunication lines. Additional work commencing next week includes demolition of the bridge in front of Arrington Hall and the removal of some of the existing landscaping within the construction site.
Work in the temporary construction access road is continuing. Expansion of handicapped parking spaces to be located between the Jepson Science Center and the new building has also begun. As soon as this work is finished, new asphalt covering will be applied to all road and parking surfaces. The Simpson Library access road (which has been partially torn up due to some utility work) will also receive a new asphalt coat.
Major ground breaking for the project is set for middle to late June. Work on the foundation for the new building will start at that time.
For updates on the project, refer to this link: http://provost.umw.edu/latest-developments/
Richard R. Pearce
Vice President for Administration and Finance and CFO
University of Mary Washington
1301 College Avenue
Fredericksburg, VA 22401
(540) 654-1020
(540) 654-1162 (fax)